Engine Mount Installed123 viewsThe fuselage is leveled in pitch and roll. The engine mount is leveled across the nose gear attach points and the bolt holes located.
|
|

Ramp Install Aft58 viewsThe Q-cell radius is installed bonding the ramp to the upper cowling and preparing the parts for laminate strips to be applied.
|
|

Rib and Spar Fitting103 viewsBoth pieces trimmed per the manual
|
|

Locating the Horizontal Stabalizer spar79 views
|
|

Canopy Gas Spring Extended Side View151 views
|
|

Horizontal Stabilizer Install Prep 1149 views
|
|

Baffle seal transition117 views
|
|